This is an older
"Farm House" located on the North end of Miller Bay. The Kitchen
floor had been built directly over an older structurally unstable
existing deck. The floor had compressed more than 1" on the exterior
walls causing the cabinets to fall away from the countertops.
To complete repairs
we had to support the 2nd floor from below, remove the floor framing
to sub-soil, excavate 18" of dirt to allow clearance to the new
floor framing, replace the sub-floor and rotten wall framing. We
then installed new drywall & paint, new "Pergo" flooring, reset the
cabinets, new counter tops, and reset appliances. On the exterior
new wall sheeting and sidings were installed.
This project lasted
27 days and had a completed cost of $ 21,500.00.